Technology Development

Further endeavoring in R&D for future growth engines to prepare for the Fourth Industrial Revolution.

HomeTechnology DevelopmentIntellectual Properties

R&D

Key Research Projects

  • Smart Construction Technology Development Project
    (Subprojects 10, 11, and 12)

    Smart Knowledge Management System

    Smart Delivery System

    Real-time Borehole Log Generation Program

    Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2020.04 ~ 2025.12
    Development of integrated management technology for road construction production processes and smart knowledge management, based on standardized digital data integration
  • XR Flagship Project
     

    Real World

    Virtual World

    Digital Twin

    Immersive 3D Model Generation

    Construction Phase

    Process Simulation

    Road-driving Simulation

    Ordering AgencyMinistry of Science and ICT Research Term2021.05 ~ 2023.12
    XR-based Innovative Construction Design System

Research Achievements

  • Ordering AgencyMinistry of Science, ICT and Future Planning Research Term2013.10 ~ 2018.07
    Marine Purification Pontoon Bioceramic Membrane Development
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2014.10 ~ 2016.10
    Low Girder Depth Integral Bridge using Segmented Girder with High Strength Concrete and Piles
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2012.05 ~ 2015.05
    Slim shield tunnel design technology development and design guideline proposal
    • Drainage concept applied drainage hole resulting in 10-20% slimmer segments
    • 20% manufacturing price and 10% tunnel construction cost reduction, 20% reduction in CO2 production
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2012.08 ~ 2014.07
    Standardization and manufacturing technology development of end girder depth increasing type pretensioned girder with movable reaction bed and debonding
    • Improved appearance pretensioned girder cross-section standardization
    • Production and quality management technology acquisition
    • 10-20% economical improvement over existing PSC girder
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2008.09 ~ 2013.07
    Key 1. SMART Highway road foundation facility/road structure durability assurance technology development
    • Design and construction standard improvement of access/buffer/interior reinforced slab
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2008.09 ~ 2013.07
    Key 4. SMART Highway construction & facility standard and test bed construction/SMART Highway implementation plan research and test bed construction
    • SMART highway project model commercialization type suggestion and service package plan research
    • Development of transportation service for futuristic and advanced road
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2012.06 ~ 2013.04
    Carbon reduction type soil improvement technology development (Carbon-neutral road technology development)
    • Soil improvement material review
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2008.07 ~ 2012.08
    On-site measurement monitoring system construction (Road antifreezing layer effectiveness verification and installation standard research)
    • Construction of on-site measuring system for low embankment (less than 2m) sections
    • On-site measurement data DB construction and analysis
    • Research on continuous monitoring methods of on-site measurement data
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2010.09 ~ 2011.09
    Road landscape design technology development
    • Development of road landscape design methods and core facility design type with considerations for scenery and design
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2005.11 ~ 2010.08
    Mountainous region road line design & advanced Korean rest area technology development
    • Suggesting road line design plans suitable for Korean mountain regions
    • Advanced Korean rest area model development and design plan proposal
  • Ordering AgencySmall and Medium Business Administration Research Term2009.06 ~ 2010.05
    Wireless conference system allowingtwo-way information exchange on a Wi-Fi network
    • Development of a wireless conference system allowing up to 30 participants with a central controller and a personal station on a Wi-Fi network
  • Ordering AgencyMinistry of Land, Infrastructure and Transport Research Term2006.12 ~ 2009.12
    Functional improvement construction research of cement concrete pavement with consideration for structural function
    • Construction joint fracture inducing device and construction method development
    • Proper construction joint distance for life extension and optimal performance
    • Membrane use standard proposal
  • Ordering AgencyDaeJon Regional Construction and Management Administration Research Term2007.06 ~ 2008.06
    Enhanced PSC beam application plan
    • Improved PSC beam development which may be applied to a maximum distance of 3.3m with considerations for the inner width of lanes of national highway and expressways