-
Seoul Metro
Precision Safety Inspection Service for Bridge Structures on Lines 3 and 4 Including Dongho Bridge
2022-12-15~2023-04-13
-
Seoul Metro
Detailed Inspection and Performance Evaluation for Track Facilities between Banghwa and Hwagok on Line 5 (2022)
2022-12-15~2023-04-13
-
Dangjin City
Detailed Safety Inspection of Yesan–Dangjin Industrial Waterworks (2022)
2022-10-29~2022-11-27
-
Dangjin City
Detailed Safety Inspection of Sluice Gates and Embankments on National River (Sapgyocheon)
2022-09-22~2022-11-20
-
Buyeo-gun
Detailed Safety Inspection for Mori Bridge and 5 Other Locations (2022)
2022-08-29~2022-10-27
-
Geumgang River Basin Environmental Office
Detailed Safety Inspection for Geumgang Gaechukje and 9 Other Sites (2022)
2022-05-24~2022-08-21
-
Korea Rural Community Corporation
Detailed Safety Diagnosis and Inspection for Gungpyeong Reservoir and 36 Other Locations (2022)
2022-05-24~2022-08-21
-
Yesan National Land Management Office
Detailed Safety Diagnosis for Sansu 1 Bridge on National Route 45 and 2 Other Locations (Including Seismic and Performance Evaluation)
2022-05-12~2022-12-19
-
Korea Expressway Corporation
Detailed Safety Inspection and Performance Evaluation for 24 Locations, including Bugok 3 Bridge (Damyang) on Gochang–Damyang Expressway (2022)
2022-05-11-2022-12-30
-
Yesan National Land Management Office
Detailed Safety Inspection for Cheongseonggyo (Lower) and 3 Other Sites on National Route 29 (Including Seismic Performance Evaluation)
2022-05-10~2023-01-04
-
Korea Expressway Corporation
Detailed Safety Inspection and Performance Evaluation for 50 Locations, including Geumdae 1 Bridge (Busan) on the Jungang Line (2022)
2022-05-09~2022-12-20
-
Yesan National Land Management Office
Detailed Safety Inspection for 8 Sites, including Pyeongsang Bridge on National Route 21
2022-05-02~2022-12-27
-
Jinju National Land Management Office
Detailed and Regular Safety Inspection and Performance Evaluation for 15 Sites, including Gacheon Bridge on National Route 24
2022-03-28~2022-09-23
-
Dangjin City
Detailed Safety Inspection for Water Supply Facilities (2022)
2022-03-04~2022-05-02
-
Dangjin City
Detailed Safety Inspection for Sluice Gates on the Local River (Dangjincheon)
2022-01-26~2022-02-24
-
Korea Expressway Corporation
Detailed Safety Diagnosis and Performance Evaluation for Structures (2021, Busan Gyeongnam S10)
2021-04-30~2022-06-03
-
Uijeongbu National Land Management Office
Detailed Safety Diagnosis for Yongdam Bridge on National Route 6
2021-03-29~2021-07-26
-
Yesan National Land Management Office
Detailed Safety Diagnosis for Wonnam Bridge (Upper) and 2 Other Bridges on National Route 45 (including Performance Evaluation)
2020-06-10~2021-01-05
-
Korea Expressway Corporation
Detailed Safety Diagnosis and Performance Evaluation for 16 Sites, including Jinju Bridge (Tongyeong) on Jungbu Line (2020)
2020-04-27~2020-12-10
-
Korea Expressway Corporation
Detailed Safety Diagnosis and Performance Evaluation for 11 Sites, including Mihocheon Bridge (Busan) on the Gyeongbu Line (2020)
2020-04-16~2020-12-17
-
Hanwha E&C
Expressway No.14 Construction (Section 4) between Hamyang and Changnyeong
2019-05-27~2024-12-31
-
Gyeryong Construction Industrial Co., Ltd. & KSC Construction Co., Ltd.
Construction of Shihwa JCT on the 2nd Capital Area Ring Road (Ansan–Incheon)
2019-05-24~2020-12-14
-
Korea Expressway Corporation
Detailed Safety Diagnosis and Performance Evaluation for 24 Sites, including Gyeongho River 6 Bridge (Tongyeong) on the Jungbu Line (2019)
2019-05-21~2019-12-16
-
Gongju City, Chungcheongnam-do
Detailed Inspection for 5 Sites, including Okseong Bridge
2019-05-21~2019-09-17
-
Korea Expressway Corporation Daejeon-Chungnam Headquarters
Detailed Safety Inspection and Performance Evaluation for 6 Bridges, including Songak IC4 Bridge on the Seohaean Line (2019)
2019-03-19~2019-06-30
-
Jinyeong National Land Management Office
Detailed Inspection and Performance Evaluation for 23 Sites, including Nakdong Bridge (Upper) on the National Route 5
2018-11-01~2019-01-29
-
Korea Expressway Corporation
Detailed Safety Diagnosis for 29 Sites including Gasan Bridge (Tongyeong) on Jungbu Line (2018)
2018-06-01~2019-02-15
-
Asan City, Chungcheongnam-do
Detailed Inspection for River Facilities in Gokgyocheon, Asan District
2018-03-02~2018-05-30
-
Dangjin City, Chungcheongnam-do
Detailed Safety Diagnosis for Sigokgyo Bridge (2018)
2018-02-05~2018-05-05
-
Samsung C&T Corporation
Construction of Seoul Subway Line 9 Phase 3, Section 919
2018-02-01~2018-12-31
-
Elim Construction Co., Ltd.
Construction of Phase 3 (Total Phosphorus) Treatment Facility at Jungnang Water Reclamation Center
2017-07-18~2020-01-31
-
Nonsan National Land Management Office
Detailed Inspection for 3 Sites, including Gyeryong Bridge on National Route 1
2017-04-20~2017-08-17
-
Seoul Metropolitan Government
Detailed Safety Diagnosis of Hannam Bridge (Downstream) (2017)
2017-03-16~2017-11-10
-
Seoul Metropolitan Government
Detailed Safety Diagnosis for Geumcheon Bridge and 1 Other Location (2017)
2017-03-13~2017-11-07
-
Kumho Industrial Co., Ltd.
Construction of Section 1 of the Icheon–Osan Private Expressway PPP Project
2017-02-15~2022-03-31
-
Lotte Engineering & Construction Co., Ltd.
Construction of the Road between Seocho and Bangbae
2016-12-14~2019-05-31
-
Seohee Construction Co., Ltd.
New Trackbed and Miscellaneous Works for the Double Track Railway between Hongseong and Songsan on the Seohae Line, Section 6
2016-09-19~2020-12-31
-
Hanshin Engineering & Construction Co., Ltd.
New Trackbed and Miscellaneous Works for the Double Track Railway between Dodam and Yeongcheon on the Jungang Line, Section 12
2016-05-23~2020-12-31
-
Namhae General Construction Co., Ltd.
Construction of the National Road between Hadong and Hwagae
2014-04-25~2020-12-31
-
Namyangju City
Detailed Safety Inspection for Environmental Infrastructure
2011-05-25~2011-10-21
-
Hanjin Heavy Industries & Construction Co., Ltd.
Construction of the Expressway between Samcheok and Donghae (Section 4)
2009-12-01~2016-12-31
-
Dongbu Corporation
Construction of the Road between Taebaek and Dogye
2008-04-23~2016-12-31
-
Daewoo Engineering & Construction Co., Ltd.
Section 8 of the Guri–Pocheon Expressway Private Investment Project
2008-03-28~2011-12-31