We provide optimal bridge design and promote reasonable structural design for major national highway projects, and integrate innovative structural engineering into traditional design methods to continuously advance and expand our engineering capabilities. We also provide structural planning, design, analysis, and safety assessments satisfying special requirements necessary for various industries.
Structure Business Areas
We provide optimal bridge and structural design, and carry out planning, design, and safety evaluation of structures that meet diverse requirements.
Private Investment Projects
Planning and design of general and special bridges
Design of structures with excellent functionality and maintainability
Basic and Detailed Design of Expressways, National Roads, and Local Roads
Planning and design of bridges and underground structures (underpasses)
Economical and safe bridge design
Bid Design and Technical Proposals
General and alternative bid designs, and technical proposals (design competitions)
Design of innovative and specialized structures
Design and Reinforcement of Public and Temporary Structures
Seismic reinforcement design and load-bearing evaluation of public structures
Safety assessment of temporary structures during construction
Structure Representative Projects
Daeyang Consultants Co., Ltd. and Two Other CompaniesIncheon–New Port Hybrid Cable-Stayed Bridge (Detailed Design, T/K)2010.01.02 ~ 2010.02.28
Daelim Industrial Co., Ltd.Songsan Green City–Siwha MTV Connecting Road Construction2018.06.01 ~ 2018.10.31
Incheon–Gimpo Expressway Co., Ltd.2nd Ring Expressway (Incheon–Gimpo Section): Gyeongin Ara Bridge (PSC Box Girder)2011.05.11 ~ 2012.03.31
Korea Expressway CorporationSejong–Pocheon Expressway: Gosam Bridge (Extradosed Bridge)2017.12.20 ~ 2019.07.24
Hanwha E&CBongdam–Songsan Expressway Construction Design – 43 Bridges2012-07-04~2016-08-31
Incheon–Gimpo Expressway Co., Ltd.Second Ring Road (Incheon–Gimpo) – PSC Box Girder Bridge over Ara Waterway2011-05-11~2012-03-31
Daeyang Consultant Co., Ltd. and 2 other companiesIncheon New Port Access Road and Revetment Construction Section 2 – Hybrid Cable-Stayed Bridge2010-01-02~2010-02-28
KCC E&C and 3 other companiesGwanggyo New Town Green Corridor Pedestrian Bridge Installation (T/K) – Truss Bridge2009-12-30~2010-04-30